How to make a Gantt chart in Confluence from a table or spreadsheet
By Jake Marsh · Updated
To make a Gantt chart in Confluence from a table, save the table as a CSV file with at least a Title and a Start column, add a Milewell roadmap to the page, click Import Roadmap Planner or CSV, choose CSV file and pick the file. Each row becomes a bar, a milestone or a marker, grouped into lanes by a Lane column if you have one.
Getting the table into a CSV
If the task list lives in a spreadsheet, save or download it as CSV (in Excel, File > Save As > CSV; in Google Sheets, File > Download > Comma-separated values). If it lives in a Confluence table, copy the table into a spreadsheet first and save that as CSV.
Columns Milewell reads
Columns are matched by their header name, in any order and any letter case.
| Column | Also accepted as | What it does |
|---|---|---|
| Title (required) | Name, Item, Summary | The text on the bar |
| Start (required) | Start date, From, Begin | First day of the bar, or the date of a milestone or marker |
| End | End date, Finish, Due, Due date, To | Last day of the bar |
| Lane | Group, Team, Swimlane, Stream, Workstream | Which lane the row goes in; new names make new lanes |
| Type | Kind | Bar, Milestone or Marker |
| Progress | % done, Percent complete, Done | The progress line along the bottom of a bar |
| Color | Colour | A color name from Milewell's palette |
| Link | Jira, Issue, Key | A Jira key such as PAY-142, or page: and a Confluence page id |
| Depends on | Dependencies, Predecessors | Titles of the rows this one waits for, separated by ; |
| Notes | Description | Text shown in the bar's panel |
A row with an empty End and no Type becomes a milestone, which suits sign-off dates in a task list.
Steps
- Add a Milewell roadmap: edit the page, type /Milewell, pick Milewell roadmap and publish.
- Click Import Roadmap Planner or CSV, then CSV file, and choose your file.
- Check the dates. Milewell reads 2026-03-31, 3/31/2026 and 31.03.2026. If your file writes days first with slashes (31/03/2026), tick day first.
- Look over the list of skipped rows. A row without a start date Milewell can read is listed by row number and title, never dropped without telling you.
- Import. If the roadmap already has items, choose Add to this roadmap or Replace this roadmap. A replaced roadmap stays in History, so you can restore it.
A small example
Lane,Title,Start,End,Depends on
Design,Page designs,2026-03-02,2026-03-13,
Build,Front end,2026-03-16,2026-04-03,Page designs
Launch,Go live,2026-04-07,,Front end
This gives three lanes, two bars joined by a dependency arrow, and a "Go live" milestone that waits for the front end.
Keeping the chart and the spreadsheet in step
After the import, the chart is its own copy: editing the spreadsheet doesn't change it. You can either plan on the chart from then on, or re-import with Replace this roadmap when the spreadsheet changes. Copy / download also gives you a CSV of the chart, and a CSV downloaded from Milewell imports back as it was.
What it costs
Milewell is $15 a month for up to 10 users, or $150 a year. From 11 users it is $1.50 per user a month, with lower rates for larger sites. Atlassian bills it, with a 30-day free trial. Install it and see every feature on the Milewell page, or read the Milewell documentation.
Milewell: Roadmaps and Gantt for Confluence
Roadmaps and Gantt charts on Confluence pages that save every change as a version, with dependencies, milestones and Jira links. From $15 a month for up to 10 users.
Questions
Can Milewell read a table that is already on the Confluence page?
No. It imports a CSV file or a built-in Roadmap Planner on the same page. Copy the table into a spreadsheet and save it as CSV.
What separators does the CSV import accept?
Commas, semicolons and tabs. Milewell picks the one used in the header row.
Can a cell put a formula into the CSV I download later?
No. Values that start like a formula are written so spreadsheets read them as text.
Is there a row limit?
A roadmap holds up to 3,000 bars, 1,000 milestones and 200 markers, spread across up to 100 lanes.