How to track technician time on site and drive time in GoHighLevel

By Jake Marsh · Updated

To track how long technicians spend on site and driving for GoHighLevel jobs, have them tap On my way, Arrived and Finish job on their Wrenchwell job page. Wrenchwell counts drive time from On my way to Arrived and time on site from Arrived to Finish, and the Timesheet tab shows both per technician and day, with jobs finished, for the week. Download CSV gives the same week as a spreadsheet for payroll or job costing.

How the times are counted

TapStartsEnds
On my wayDrive time
ArrivedTime on siteDrive time
Finish jobTime on site

A job the technician never marks on the way still records time on site once they tap Arrived and Finish job. Cancelled jobs are left out.

Steps

  1. Add technicians on the Technicians tab and send each their personal link.
  2. Ask them to tap all three buttons on every job. On my way also texts the customer if you've turned that on, which gives technicians a reason to use it.
  3. Open Timesheet in Wrenchwell. It shows the current week, Monday to Sunday; use Week to go back or forward.
  4. Check each technician's row: jobs finished, minutes on site and drive minutes per day, and the week's totals.
  5. Download CSV. One row per technician, with jobs, on-site minutes and travel minutes for each day, then the week's totals.

What the numbers are good for

  • Payroll: on-site plus drive time, compared with clocked hours, shows unpaid gaps such as long lunches or supply runs.
  • Pricing: average time on site for a job type tells you whether a flat-rate price covers the work.
  • Scheduling: if a technician's drive time is high, try Suggest order on the Dispatch tab, which reorders the day for the shortest straight-line drive from your shop without changing booked times.

Per job, in workflows

The Job completed trigger carries the minutes on site for that job, so a workflow can save it to a custom field on the contact or opportunity, or alert a manager when a job runs much longer than usual.

What it costs

Wrenchwell is Crew $129 a month for up to 5 technicians, Team $249 for up to 15 or Fleet $449 for up to 40, per sub-account (yearly 10 times the monthly), after a 14-day free trial with up to 15 technicians. See the Wrenchwell page.

Wrenchwell: Field Service Jobs & Dispatch

Bookings become jobs, technicians get their day on their phone, and every finished visit leaves a report with photos and a signature. From $129 a month per business account.


Questions

Is this a time clock?

No. It measures the time between taps on each job, not a shift. Use your payroll tool for clocking in and out.

What if a technician forgets to tap Arrived?

The job's times are only as good as the taps. Office staff can see each job's history on the Dispatch tab to spot missed ones.

Does it track location between jobs?

No. Wrenchwell doesn't follow technicians by GPS. The phone's position is used only once, for the ETA when they tap On my way.

Does a former technician's time stay in the timesheet?

Yes. Their finished jobs stay in the week they happened, listed as a former technician if they were removed.