Risk matrix generator
Add each risk with a likelihood and an impact, and the tool places it on a colored heat map and ranks the list by score (likelihood times impact). Download the register as a CSV for Jira, Confluence or a sheet.
Everything runs in your browser. Your text and files stay on your device and are never uploaded.
Risks
One risk per line: name, likelihood, impact. Use numbers or the scale names (Likely, Major). Tabs work too.
Heat map
- Low
- Medium
- High
- Critical
Scale: likelihood Rare, Unlikely, Possible, Likely, Almost certain; impact Negligible, Minor, Moderate, Major, Severe.
Ranked register
Name a risk above, or load the example, and the ranked list and heat map fill in.
How to use it
- Pick a 5 x 5 or 3 x 3 matrix, or click Load example to see a filled one.
- Name each risk and choose its likelihood and impact. Use Add risk for more rows, or paste lines like Vendor delay, 4, 3 from a sheet.
- Find each risk by its number on the heat map. Cells show their score, and the color runs from low to critical.
- Read the ranked register below: highest score first, with a rating for each risk.
- Download the CSV or copy it, then paste it into your risk register, a Confluence table or a status report.
How the ratings work
Each risk gets a score of likelihood times impact. On the 5 x 5 grid, 1 to 4 is low, 5 to 9 is medium, 10 to 14 is high and 15 to 25 is critical. On the 3 x 3 grid, 1 to 2 is low, 3 to 4 is medium, 6 is high and 9 is critical.
| Score | Likelihood | Impact |
|---|---|---|
| 1 | Rare | Negligible |
| 2 | Unlikely | Minor |
| 3 | Possible | Moderate |
| 4 | Likely | Major |
| 5 | Almost certain | Severe |
Agree what each step means for your team before you score. For example, define Severe as more than a month of delay or a customer-facing outage, so two people rating the same risk land on the same number.
Questions
How do you calculate a risk score?
Multiply likelihood by impact. A risk with likelihood 4 and impact 3 scores 12, which is high on a 5 x 5 matrix. A higher score means the risk needs attention sooner.
What do the colors on a risk matrix mean?
Green is low, yellow is medium, orange is high and red is critical. Here, 5 x 5 scores of 1 to 4 are low, 5 to 9 medium, 10 to 14 high and 15 to 25 critical. Each rating is also written out in the register, so color is never the only signal.
Should I use a 3x3 or a 5x5 risk matrix?
Use 3 x 3 for a quick project check with few risks. Use 5 x 5 when you need finer separation between risks, or your company policy already scores on five levels.
What is the difference between likelihood and impact?
Likelihood is how probable it is that the risk happens. Impact is how bad it is if it does. A rare event with a severe impact and a frequent event with a minor impact can land in very different cells.
Can I import risks from a spreadsheet?
Yes. Copy rows with the risk name first, then likelihood, then impact, and paste them into the box. Ratings can be numbers or scale names like Likely or Major. Comma and tab separated text both work, and a header row is skipped.
Is my risk list uploaded anywhere?
No. Scoring, the heat map and the CSV are all built in your browser. Nothing is saved, so download the CSV before you close the page.